1 to 6 of 6 Results
Dec 13, 2022
AP11: Imperfection measurements on timber members at risk of buckling. |
Dec 13, 2022
RP7-1: Development of an integrated approach of testing and numerical verifications. |
Jul 5, 2022
RP19-1: Leveraging the building material as part of the robotic kinematic system for parallel construction. RP19-2: Co-design methods for developing distributed cooperative multi-robot systems for construction. |
Jun 14, 2022
RP12-1: Computational co-design for fibre composite building systems including visual analytics and simulation interfaces. RP12-2: Computational co-design framework for fibre composite building systems. |
Jun 13, 2022
RP10-1: Co-design from architectural, historical and social science perspectives. RP10-2: Co-design from architectural, social and computational perspectives: methods for the integrative exploration of design spaces for future timber buildings within existing urban contexts. |
Jun 13, 2022
RP4-1: Cyber-physical fabrication platform for wood building system utilizing human-machine collaborations including immersive analytics for augmented reality. RP4-2: Cyber‐physical fabrication platform: fluid fabrication – extending the adaptivity of island-based fabrication and... |